HLY MACHINERY PLANTS · QINGZHOU (SHANDONG) & YANGZHOU (JIANGSU), CHINA
Factory Direct Supply · 72h Pre-Shipment Live Testing
Direct Factory Export to Global Markets
Plant Dispatch: +86 17353605474
|
[email protected]
Beranda
Produk
Artikel
Tentang Kami
Lokasi Pengiriman
Dokumen
Kontak
Bahasa Indonesia
id
WhatsApp
Get Factory Quote
Bahasa Indonesia
id
Beranda
/
Dokumen Teknis
/
HLY-MNT-01: Precast Concrete Pipe Mold Daily Cleaning & End-Ring Alignment Protocol
Kembali ke Daftar Dokumen
Perawatan
HLY-MNT-01: Precast Concrete Pipe Mold Daily Cleaning & End-Ring Alignment Protocol
September 26, 2026
HLY-MNT-01-Pipe-Mold-Maintenance.pdf
1. Mandatory 15-Minute Post-Demolding Cleaning Rule
Within 15 minutes of pipe stripping, crews must remove cement paste with pneumatic scrapers and curved brass blades.
Zero Hammering Policy
: Striking formwork plates with steel sledgehammers is strictly prohibited! Use copper drifts or polyurethane mallets only.
2. End-Ring Alignment & Lathe Re-machining Schedule
Measure runner ring circularity weekly using calipers across 4 diameters; maximum allowable out-of-roundness is
$\le$ 1.0 mm
.
End squareness deviation must not exceed $\le$ 1.5 mm for drainage pipes and
$\le$ 0.8 mm
for jacking pipes.
3. Longitudinal Flange & Gasket Maintenance
Check longitudinal flange mating clearance with feeler gauges; gap must not exceed
1.5 mm
.
Replace EPDM heat-resistant gasket in flange grooves every 100 production cycles to prevent joint slurry blowouts.
4. Long-Term Anti-Corrosion Storage
Apply heavy-duty paraffinic rust-inhibiting oil on molds idle for $>10$ days.
Support molds on wooden dunnage timbers (height $\ge$ 150 mm) on level concrete pads. Never stack more than 2 tiers high.
Unduh Lampiran
HLY-MNT-01-Pipe-Mold-Maintenance.pdf
Klik untuk mengunduh atau membuka di jendela baru
Jelajahi Semua Dokumen
Hubungi Dukungan Teknis
HLY-MNT-01: Precast Concrete Pipe Mold Daily Cleaning & End-Ring Alignment Protocol | Qingzhou Heliyuan Machinery