HLY-OP-01: Suspension Roller Machine Console Dual-Speed & Auto-Feeding SOP
September 18, 2026HLY-OP-01-Suspension-Roller-Console-SOP.pdf
1. Pre-Shift 5-Minute Safety Checklist
2. 4-Stage Feeding & Speed Calibration Sequence
* Stage 1 (Bedding Layer, 400–600 rpm): Run motor at low speed; advance feed conveyor to spread mix across barrel to 1/2 wall thickness, securing the rebar cage.
* Stage 2 (Joint Reinforcement, 500–700 rpm): Dwell conveyor at spigot and bell ends for 15–20s each to densify joint profiles.
* Stage 3 (Full Pass Smoothing, 600–750 rpm): Feed continuously until concrete sits 3–5 mm proud of end rings.
* Stage 4 (Net Compaction Finish, 900–1300 rpm): Retract feeder; ramp VFD to compaction speed. Strictly observe duration limits:
- DN300–DN600: 3.0 – 4.0 min;
- DN800–DN1200: 4.5 – 6.0 min;
- DN1350–DN2000: 6.0 – 8.0 min.